Q
Name |
Description |
Content |
||||
MV_QAPCON |
Name to CONDITIONAL APPROVED |
Conditional Approved |
||||
MV_QAPQIEP |
Before deleting instrument, check if it is in use in Entry Inspection and Process Inspection environment. |
2 |
||||
MV_QAPROV |
Name to APPROVED. |
Approved |
||||
MV_QATUESC |
After family range association, it suggests a mandatory calibration as YES |
1 |
||||
MV_QBNDMED |
When a calibration is performed, it suggests the first range/standard with non-collected initial value. |
1 |
||||
MV_QCALINC |
Uncertainty formula calculation: 1 = (Algebraic Sum (Inc.Tot = Inc. Instr. + IR + RR)); 2 = (Square Sum (Inc.Tot = ((Inc.Instr)2 + IR 2 + RR2)) |
1 |
||||
MV_QCLPERC |
For ranges with uncertainty report with metrological confirmation and percentage calculation type, consider Tolerance/Process field in uncertainty calculation. Options: 1= Yes, performs the calculation by percentage and 2= No, does not perform calculation. |
1 |
||||
MV_QDECPAD |
It defines decimal place quantity to be used during data collecting. If content = 1, it searches for decimal place quantity defined in initial Range field. When empty, content of VVC (Standard Registry) field will be considered. When content = 2, it searches decimal place quantity of VVC field. |
2 |
||||
MV_QDIRGRA |
Directory |
\ |
||||
MV_QFREQAF |
Automatic checking frequency (uses Schumacher Table - cond. of receiving) |
Y |
||||
MV_QICEWOD |
It prints Calibration Certificate in Word® format, being 1=Yes and 2=No |
2 |
||||
MV_QINCDM |
It adds Medium Deviance in Total Uncertain. |
Y |
||||
MV_QINCDP |
It considers the highest standard deviation of all measurements of the same range for uncertainty calculation of each range point. |
N |
||||
MV_QINCRR |
It adds the R&R value in uncertainty calculation. |
N |
||||
MV_QMOESPT |
During calibration, it orders ranges/standards by checking type and standard. |
1 |
||||
MV_QMSOMED |
It considers uncertainty value of secondary standards/ instrument, used in total uncertainty (1) If 2, the system does not consider such uncertainties in total uncertainty. |
1 |
||||
MV_QMTIOPC |
It indicates calibration screen reopening, being 2=does not reopen the screen after confirmation. |
2 |
||||
MV_QMTISHU |
When Schumacher concept is used, it suggests the option extension/reduction of calibration validity as Yes (1). |
2 |
||||
MV_QMTPCES |
To Soma type ranges, it considers the decimal places quantity defined in range initial value. |
2 |
||||
MV_QMTDDOT |
It defines the name .DOT file. |
certprinc.dot |
||||
MV_QNGREV |
It links the fields that are not considered for instruments revision creation. |
QM2_STATUS QM2_BITMAP QM2_CHAVE QM2_ONLINE QM2_BAUDRA QM2_PARITY QM2_PORTA QM2_BITTDAD QM2_STOPS QM2_DESCR |
||||
MV_QPATHWD |
It defines the path where the original file .DOT is registered. |
\SYSTEM\MODELOS |
||||
MV_QPATHWT |
It defines where file .DOT copy will be recorded. |
GETTEMPPATH() |
||||
MV_QPDELCA |
It allows the calibration maintenance (Alteration/Deletion) with dates inferior to last date of instrument calibration (1=no, 2=yes). |
1 |
||||
MV_QQTDIAS |
It defines amount of days to send the e-mail, warning about instrument measurement expiration. |
5 |
||||
MV_QREPRO |
Name to REPROVED. |
REPROVED |
||||
MV_QRRIAPR |
Limit value to GOOD report to R&R test. |
10.00 |
||||
MV_QRRICON |
Limit value to ACCEPTABLE report to R&R test. |
30.00 |
||||
MV_QRRIREP |
Limit value to UNACCEPTABLE report to R&R test. |
100.00 |
||||
MV_QRRTAPR |
Showed Text GOOD for R&R test. |
GOOD |
||||
MV_QRRTCON |
Represented text ACCEPTABLE to R&R test. |
ACCEPTABLE |
||||
MV_QRRTREP |
Represented text UNACCEPTABLE to R&R test. |
UNACCEPTABLE |
||||
MV_QSUGINB |
In description, it suggests type B uncertainties of last calibration, as type character (1). If 2, does not suggest uncertainties. If instrument does not have calibration, type B uncertainty suggested will be the one previously registered in instruments Family Register. |
2 |
||||
MV_QSULOG |
It considers logged user in the system as responsible for instrument calibration. |
2 |
||||
MV_QSUMITB |
It defines if type A Uncertain with type B Uncertainty must be summed, to show total Uncertainty. |
2 |
||||
MV_QSUPADS |
It defines if secondary/instruments standards used must be suggested in the last review of the main instrument that was used. |
2 |
||||
MV_QVLFIMF |
Start/Turn off alert, if final measurement values are out of specified. |
Y |
||||
MV_QMEDNOC |
It considers the average of measurement nominal values, in Tendency graphic.
|
2 |
||||
MV_QVLINIF |
Start/Turn off alert, if final measurement values are out of specified. |
Y |
||||
MV_QMTPMOV |
It defines movement type to be performed in QMT: 1 = Mov. among Dept of a same branch; 2 = Mov. among Dept of other branches. |
1 |