Lead-time
This report issues product/supplier related inflow Lead-times.
The lab reports and entered inspected inflows are checked to display test permanence related data, while there is no defined report.
 In the Results, inflow date and time in the labs are suggested from the inflow of material for inspection and, in case there is no defined date and time, their related fields can be left blank until report is defined.  |  
    
Procedures
To issue the Lead-time report:
| 1. | In the Product X Supplier Report maintenance window, click Parameters. | 
The system displays the screen for setting the parameters.
| 2. | Enter data according to Field Help instructions. | 
| • | Situation? | 
Select the inflow situations for consideration in this report, from the following:
| • | All: All inflows independently of situation. | 
| • | In Transit: Inflows yet to enter the lab. | 
| • | In Lab: Inflows already in lab, but still with no report. | 
| • | With Report: Inflows already with a final report. | 
| 3. | Check configurations and confirm printing of report. | 
See also: