Reports
After making all measurements, you must enter reports as follows:
• | admin-IN-34177a1b-7a8f-487b-ba4f-48668ea8aafb-1509025661301-f886d7a0-6209-44e5-9c23-06b0917f8e78 |
• | admin-IN-34177a1b-7a8f-487b-ba4f-48668ea8aafb-1509025661301-8cd2f590-7bbb-41b9-a72d-cbfd58f48789 |
• | admin-IN-34177a1b-7a8f-487b-ba4f-48668ea8aafb-1509025661301-f23ac8c4-15c5-4a62-a7a8-7be47aa06003 of Production Order |
Before starting report generation, several verifications are made by the system to enter the report correctly. These verifications consist in:
• | Instrument Obligatoriness |
When Instrument Family is associated in Product Specification, the inclusion of instrument in measurement is compulsory.
• | Compulsory Tests |
Product Specification Register has the Compulsory Test field. This field make the test compulsory when measurements are collected. If the test is not filled out when Laboratory Report is entered, the system indicates that there is a compulsory test without measurements registered and, if you want to proceed with the report, the system prompts the Report as Rejected even without the measurements.
• | Compulsory Tester |
Tester code is checked when Laboratory Report is entered. Tester field is compulsory to make the report.
• | Sampling Plan |
When the Report is entered, if the Test has associated Sampling Plan, the system checks the amount of collected measurements with the sample size, entering it in Sampling Plan Register. If there is any difference between the amounts found, only a warning is displayed and Laboratory Report can be filled out.
This routine make production order unavailable when there is an unsatisfactory report of PO, since you do not need to proceed with its production.
By default, the parameter confluencepage-962cb8ab-745e-4e9c-bbeb-0e897b01b2e2 is configured as E, however, options for other reports can be displayed. To do so, just enter them. After saving the result, a screen is displayed requesting you to close or interrupt the PO, where:
• | With the Closing option, production is closed automatically as long as there are partial annotations. |
• | With the Interruption option, production is interrupted temporarily until it is reactivated manually. |