Drawback

Important:

From this version onwards, there has been a change in the Export Shipment Maintenance routine, so the anteriority of an item is considered, that is, the link between and import and an export.

Previously, the System evaluated only the balance to be exported to confirm the Concession; however, after the anteriority concept, the System also checks whether an agreement confirmation, with the production lead-time of the exported product combined to the product structure stated in the Concession, is possible.