Set the parameter MV_TABECON with the content you wish to view.



Procedures

  1. To add an indicator, access the routine and click Add.
  2. View the screen and fill out the fields as needed.
  3. After filling out the data, click Confirm.



Example of how to fill out the fields:

Alias: Enter the code of the table (the same entered in parameter MV_TABECON).

Economic Index: As created in the Economic Indicators Register.

Index Field: It corresponds to the field of the indices table tha receives the code. Examples: CN7_CODIGO.

Value Field: CN7_VLREAL.

Date Field: CN7_DATA.

Competence Period Field: strzero(MONTH(AIW->AIW_DATA),2,0+"-"+STRZERO(YEAR(AIW-.AIW_DATA),4,0)

Projected Value Field: CN7_VLPROJ.

Formula for Projected Value: AIW->AIW_VALOR *1.025

Projection Type Field: CN7_TPPROJ.

Formula for Projection Type: "2".

Overlay Index: 2-No.