• A Confluence está sendo executada atualmente com todos os plugins que não são do sistema desabilitados. Pode haver perda de algumas funcionalidades
Páginas filhas
  • Production Target-sfcc520_meta_produtcao.htm

Production Target

It presents the production targets used to calculate the BTS indicator. Since BTS is calculated through the sequence use, it requires a component in the Target x Machine.

Main Fields/Controls

See below the main fields/controls of the production target:

Scheduled Hours
Split

 

For more information on these fields, refer to the topic Terms and Concepts.

Procedures

BTS - Build To Schedule
BTS_S - Production Sequence
BTS_S - Production Volume
BTS_M - Production Mix
  • Sem rótulos